Hello,
I have a Slider with several Slides. Every time i add new Item (Image) it goes as last. Is there a way to manually change the order of the Images (Slides)? I don’t see an option for drag and drop. Like on the screenshot image example, i need to make the last one as first.
Shopware Version: v6.3.5.4
Thanks!
