# Change order of the Slides (Images) in Image Slider

**URL:** https://forum.shopware.com/t/change-order-of-the-slides-images-in-image-slider/95915
**Category:** Themes & Design (EN)
**Tags:** general, templates--design, themes--design
**Created:** [23. August 2022 um 13:42 UTC](https://forum.shopware.com/t/change-order-of-the-slides-images-in-image-slider/95915 "2022-08-23T13:42:32Z")
**Posts on this page:** 2
**Page:** 1

<div class="post-metadata">

### Author: ![d\_1910](https://avatars.discourse-cdn.com/v4/letter/d/b38774/32.png) [@d\_1910](https://forum.shopware.com/u/d_1910)
#### Post date: [23. August 2022 um 13:42 UTC](https://forum.shopware.com/t/change-order-of-the-slides-images-in-image-slider/95915/1 "2022-08-23T13:42:32Z")

</div>

Hello,

I have a Slider with several Slides. Every time i add new Item (Image) it goes as last. Is there a way to manually change the order of the Images (Slides)? I don’t see an option for drag and drop. Like on the screenshot image example, i need to make the last one as first.

Shopware Version: v6.3.5.4

Thanks!

 ![slides_order](https://europe1.discourse-cdn.com/flex013/uploads/shopware/original/3X/1/f/1f4308a003ea4d4f45225cd0fae95f6234f3a3cf.jpeg)

---

<div class="post-metadata">

### Author: ![Beuber](https://avatars.discourse-cdn.com/v4/letter/b/a6a055/32.png) [@Beuber](https://forum.shopware.com/u/Beuber)
#### Post date: [2. September 2022 um 08:46 UTC](https://forum.shopware.com/t/change-order-of-the-slides-images-in-image-slider/95915/2 "2022-09-02T08:46:16Z")

</div>

I am not using Slider but media for products looks smilar so i would say drag and drop 😉
